With economic growth, the demand for natural gas as a fuel has increased recently, while its supply has seen decrease. The demand is projected to further increase and the country's currently known recoverable indigenous gas reserves are insufficient to meet this demand. Gas shortages have already emerged and shall increase substantially in the following years if indigenous supply is not supplemented through imports. This paper aims to review the regulatory framework of LNG/RLNG for creating enabling environment for import, re-gasification, sale and marketing in Pakistan. The focus of this paper is on the supply side of energy, public and private gas utilities relation with respect to LNG, natural gas market liberalization, and its comparative analysis with other fuel prices. In the short term, without importing LNG to the tune of about 800 - 1.2 MMSCFD, the demand-supply gap of the energy in Pakistan would have been much more than it is today. Irrespective of its price, however, LNG is the only short-term solution in augmenting energy supplies.
Ahmed, Nadia B. “Turn on the Lights'–Sustainable Energy Investment and Regulatory Policy: Charting the Hydrokinetic Path for Pakistan” Washington and Lee Journal of Energy, Climate, and the Environment, (2013). Accessed January 2, 2018, https://digitalcommons.pace.edu/lawfaculty/965/.
Alhajji, A. F. “What is energy security? Economic, environmental, social, foreign policy, technical and security dimensions,” Volume, 6, Issue 3, Oil, Gas & Energy Law Intelligence OGEL. Accessed September 12, 2017, https://www.ogel.org/article.asp?key=2787.
"Determination of Regasifed Liquefied Natural Gas", Oil and Gas Regulatory Authority, Case No. OGRA 6(10)-(RLNG) (2015): 1-2, accessed september4, 2017, https://www.ogra.org.pk/rlng-notified-prices.
Economic Survey of Pakistan, (2015-2016): 241. Accessed September 08, 2017, http://www.finance.gov.pk/survey/chapters_16/14_Energy.pdf.
Economic Survey of Pakistan, (2015-2016): 242. Accessed September 2, 2018, http://www.finance.gov.pk/survey/chapters_16/14_Energy.pdf.
“International Energy Security, common concept for energy producing, consuming and transit countries.” Energy Charter Secretariat. Accessed November 5, 2018, http://www.energycharter.org/what-we-do/trade-and-transit/trade-and-transit-thematic-reports/international-energy-security-common-concept-for-energy-producing-consuming-and-transit-countries-2015/.
Inter State Gas Systems (Pvt) Ltd, “Pakistan Energy Demand Projections.” Accessed October o2, 2017, http://www.isgs.pk/pakistan-energydemand-projections.
Kiani Khaleeq, “OGRA wants LNG regulatory business under one law”, June 22, 2017, accessed October 12, 2017, https://www.dawn.com/news/1189634.
Khan, Muhammad Arshad & Ahmed, Usman. “Energy Demand in Pakistan: A Disaggregate Analysis,” Pakistan Institute of Development Economics, accessed December 02, 2017, http://www.pide.org.pk/psde24/pdf/02.pdf.
“Liquefied Natural Gas.” Directorate General of Liquefied Gases. Accessed October 12, 2018, http://www.mpnr.gov.pk/mpnr/userfiles1/file/Directorat%20General%20Of%20LG's.pdf.
"LNG: Understanding the facts", U.S. Department of Energy (DOE) in collaboration with the National Association of Regulatory Utility Commissioners (NARUC), (2013): 6. Accessed September 13, 2017, https://energy.gov/sites/prod/files/2013/04/f0/LNG_primerupd.pdf.
Arif M., “Future of LNG in Pakistan”, Oil and Gas and Energy Law Intelligence Volume 15, Issue-4, (2017): 4-5.
Mehrunissa, Chaudhary, Sumra Latif Mughal, Fareeha Zafar. “Corporate Social Disclosure: A Case Study on Petroleum Industry of Pakistan” World LNG Report (World Gas Conference, 2014). Accessed January 12, 2018, http://papers.ssrn.com/sol3/papers.cfm?abstract_id=2377921 SSRN 2377921.
Mills, Robin. Risky routes: Energy Transit in Middle East, Brookings Doha Centre, April, 2016. Accessed November 21, 2017, https://www.brookings.edu/wp-content/uploads/2016/07/en-energy-transit-security-mills-2.pdf.
OGRA Annual Report (2015-16): 23-24. Accessed Sptember28, 2017, https://www.ogra.org.pk/ogra-annual-reports.
"Pakistan Energy Demand Projections", Inter State Gas Systems (Pvt) Ltd. Accessed September 02, 2017, http://www.isgs.pk/pakistan-energydemand-projections.llast.
“Present government achievements in oil and gas sector.” Directorate general of liquefied gases. Accessed October 20, 2018, http://www.mpnr.gov.pk/mpnr/userfiles1/file/Directorat%20General%20Of%20LG's.pdf.
“Unlocking the supply chain for LNG project success.” KPMG Global Energy Institute. Accessed November 4, 2018, https://assets.kpmg.com/content/dam/kpmg/pdf/2015/03/unlocking-supply-chain-LNG-project-success.pdf.
World LNG Report 2018. Edition 3 27th World Gas Conference, 2018, (International Gas Union). Accessed November 3, 2018, https://www.igu.org/sites/default/files/node-document-field_file/IGU_LNG_2018_0.pdf.